SAMARTH Classic Series Deburring & Finishing Machine is suitable for metal finishing and deburring at an affordable price with many standard features. The classic series abrasive belt deburring machine for grinding and radius edges of the final sheet metal and other flat parts. This is an automatic feed-hard machine with a belt, and the machine will defrost and sand the radius for sharp edges on cut-out parts. Grinding into the conveyor belt is possible without damaging the strap. The device works with steel, stainless steel, aluminum, and many other metals.
-
Overview
SAMARTH Classic Series Deburring & Finishing Machine is available from 150mm to 1600mm with multiple head options. It offers dual infeed and outfeed pinch rolls to ensure parts feed throughout the machine uniformly. It is compatible with a Belt, all these accessories per your industrial requirements. Its thickness measurement control can be between 1mm to 50mm of parts. It can be configured with automatic abrasive belt tracking to ensure proper belt alignment during operations.
-
Features
Features
- External Electrical Control Panel
- Separate electrical control for all functions,
- Dry operation dust extraction system
- Adjustable Pressure on Polishing station
- Easy abrasives brush roller replacement
- Adjustable conveyor speed (belt/roller) from) o.5 to 20 MPM
- Different brush grits combinations are possible to perform further surface treatment
- Emergency security switch
- Reversal conveyor speed for emergency control
-
Technical Specification
Model – Classic Series NBS 06-1 NBS 06-2 WBS 24-1 WBS 24-2 WBS 50-4 WBS 62-4 Head Type Belt / Roller Brush / Disc Brush Belt Belt Belt Belt Belt Belt Work Surface Top Side Top Side Top Side Top Side Top Side Top Side Process: Wet / Dry Dry Dry Dry Dry Dry Dry Work head 1 2 1 1 4 4 Application Sanding + Finishing + Deburring + Scratch Removal Finish Achieved - - - - - - Burr Classification Class 1,2 & 3 Class 1,2 & 3 Class 1,2 & 3 Class 1,2 & 3 Class 1,2 & 3 Class 1,2 & 3 Max Width 150 150 600 600 1250 1550 Min. Length 300 300 1000 1000 1000 1000 Min. Max Thickness 1-50 1-50 1-50 1-50 1-50 1-50 Weight of capacity kg 25Kg 25Kg 100kg 100kg 300kg 500kg Drum Diameter 125 125 150 180 180 180 Brush Diameter - - - - - - Abrasive belt Size 150mm x 2200mm 150mm x 2200mm 650mm x 2200mm 650mm x 2200mm 1300mm x 2200mm 1650mm x 2200mm Brush Action R = Rotate / O = Oscillate - - - - - - Conveyor Type R= Roller / B = Belt Belt Belt Roller / Belt Roller / Belt Roller / Belt Roller / Belt Conveyor Bed - - vacuum vacuum vacuum vacuum Conveyor speed MPM Min / Max 0.5 - 10 0.5 - 10 0.5 - 10 0.5 - 10 0.5 - 10 0.5 - 10 Machine weight 500kg 1000kg 1800kg 2500kg 4500kg 5500kg Dust collector Suggestion DCS-3 DCS-5 Auto DCS-5 Auto DCS-5 Auto DCS-5 Auto DCS-5 Auto Electrical parameters The integrated frequency converter allows the machine to work worldwide with all power supply systems and enables smooth start and enhanced motor protection. -
Applicatons
- Deburring punched, nibbled, sheared, or laser-cut sheet metal parts.
- Deburr and sand a radius to the sharp edge on cut out parts
- Uniform sanding on all edges, leaving a fine scratch pattern on the surface.
- Deburring of all edges in one pass on laser cut or stamped parts
- Calibrating or keying carbon, rubber, wood, or other soft materials.
- Grain finishing and stock removal of any material.
-
Gallery









